Processes, timelines, and cycles
Sequence templates answer different questions. A horizontal process emphasizes ordered handoffs, a timeline emphasizes chronology, and a cycle emphasizes that the last stage feeds the first again. The surrounding prose must state which relationship matters.
Horizontal process
Use list-row-simple-horizontal-arrow for a short left-to-right sequence. On
narrow screens, keep labels brief and verify that the rendered order remains
clear.
{{< infographic >}}
infographic list-row-simple-horizontal-arrow
data
title Documentation delivery
items
- label Plan
desc Define the reader and outcome
- label Write
desc Draft the smallest complete page
- label Review
desc Check facts, language, and links
- label Ship
desc Build and verify the hosted route
{{< /infographic >}}The process moves from planning through writing and review to a separately verified hosted result.
Chronological timeline
Use sequence-timeline-simple when time or release order is the primary
relationship.
{{< infographic >}}
infographic sequence-timeline-simple
data
title Release evidence
items
- label Source ready
desc Scope, copy, attribution, and review are complete
- label Checks pass
desc Theme and project-site suites pass
- label Tag public
desc The immutable module version resolves
- label Site deployed
desc Production routes pass smoke tests
{{< /infographic >}}The timeline separates four evidence points; a passing test does not skip the public-tag or deployment stages.
Continuous cycle
Use sequence-circular-simple only when the final item genuinely returns work
to the first. Do not use a cycle for a process that has a terminal state.
{{< infographic height="480px" >}}
infographic sequence-circular-simple
data
title Documentation maintenance loop
items
- label Observe
desc Collect support and search signals
- label Prioritize
desc Select a reader problem
- label Improve
desc Update content and examples
- label Verify
desc Test links, rendering, and outcomes
{{< /infographic >}}Verification produces new observations, so the maintenance loop returns to its first stage.
Selection rule
If removing the arrows or time axis would not change the meaning, use a native list or cards instead. Infographics should reveal a relationship, not decorate an otherwise unrelated set of statements.